Skip to main content

ESPR & DPP Timeline

Every delegated act, deadline, and product category on one page. Free, no signup.

18 Jul 2024In force

ESPR enters into force

Regulation (EU) 2024/1781 becomes law, replacing the Ecodesign Directive with a regulation covering nearly all physical goods on the EU market.

2025In force

First working plan

European Commission adopts the first working plan prioritising product groups for delegated acts — textiles, batteries (via separate regulation), electronics, furniture, tyres, construction.

2025–2026In progress

Delegated acts drafted

Draft delegated acts per product group define the exact DPP data fields, data carrier requirements, and timelines. Consultations with industry and member states.

2026–2027Expected

First delegated acts adopted

Textiles and electronics expected among the first ESPR delegated acts with DPP requirements. Standards bodies (CEN/CENELEC) publish interoperability specs.

18 Feb 2027batteryExpected

Battery passport mandatory

Regulation (EU) 2023/1542 (separate from ESPR) requires battery passports for EV, LMT, and industrial batteries >2kWh. QR code on the battery must link to a resolver.

2027textileExpected

Textile DPP expected

Textiles widely expected as the first ESPR category with mandatory DPP. Large retailers (H&M, Zara) already requesting supplier data ahead of regulation.

2027–2028electronicsPlanned

Electronics DPP phased

Consumer electronics expected to follow textiles. RoHS, WEEE, and energy label data feeding into the passport. Interoperability with existing CE marking.

2028–2029constructionPlanned

Construction products

Construction Products Regulation (CPR) revision aligns with ESPR. Declaration of Performance (DoP) already required; DPP-style data carrier next.

2029–2030otherPlanned

Remaining categories

Furniture, tyres, chemicals, and other product groups receive delegated acts on a rolling basis. Most physical goods on the EU market covered by 2030.

Prepare now: the deadline that matters most is 18 February 2027 for battery passports. Use the Battery Passport Checklist (71 data points by type), prototype the full passport with the ESPR builder, or run a gap analysis with the DPP Playground.

Timeline based on Regulation (EU) 2024/1781 (ESPR), Regulation (EU) 2023/1542 (Batteries), and Commission working plans as of September 2026. Delegated act dates are expected dates, not legal deadlines — verify against the official EUR-Lex publication for each act.

About the Espr Timeline

Requirements arrive product-group by product-group through delegated acts. This timeline shows every milestone: ESPR in force, working plan, delegated acts, battery passport Feb 2027, textiles 2027, electronics 2028, construction 2029.

How to use

  1. Browse timeline, filter by category, click through to tools.